Pricing — Builder’s Waste Removal, Auckland
Pricing

Two ways to pay, no surprises

One-off clear-out or an ongoing build — either way, you know the number before the truck turns up. No weighbridge dockets, no “we’ll invoice you after.”

Option 1

Fixed-price quote

Exact price — set before we arrive

Best for a one-off clear-out where you just want the pile gone and a number you can trust in advance.

  • Send photos of the pile and your address
  • We quote a fixed price to clear it all
  • That’s the price — no surprises on the day
Option 2

Per-load price

$285 +GST / load

Best when the build’s ongoing and waste keeps piling up — same flat rate, every time, labour included.

  • One flat rate, whatever’s on the truck
  • Loading labour included, every time
  • Book each load as the site needs it

What our truck actually carries

We drive a 2016 Toyota Dyna with a 4.35m deck — here’s exactly what fits, in real numbers.

  • Vehicle2016 Toyota Dyna
  • Deck length4,350 mm
  • Deck width1,900 mm
  • Side rail height350 mm
  • Typical load height above rail+250 mm
  • Effective load volume≈ 5.0 m³
  • Typical capacity~8 pallets + mixed offcuts
+250mm typical heaped load 350mm rail 4,350 mm deck length 1,900mm wide (not shown in side view)

Why one load matches a 9m³ skip

On paper, ~5m³ is smaller than a 9m³ skip. In practice, one load regularly clears the same building-site pile. Two reasons why.

Reason 1

Bulky timber wastes space, not just weight

Nobody on site has time to cut long timber and pallets down to save space — and that’s fair, it’s not a reasonable use of labour. So both a skip bin and our truck end up “full” at the same point: not when the weight limit’s hit, but when the air gaps between whole pallets and long offcuts run out. Our deck typically takes about 8-9 used pallets plus mixed framing of different lengths and subfloor offcuts — roughly what a 9m³ skip holds once it’s loaded the same uncut way.

Reason 2

Skip bins can’t take the heavy stuff anyway

Most Auckland 9m³ general waste bins cap out around 1,300–1,700kg, with overage fees of roughly $15–30+GST per 100kg over — and several suppliers ban bricks, concrete and soil from the general bin entirely. So that “9m³” is really only usable for lighter waste: plastic, gib board, foam offcuts. We take the bricks, blocks and concrete on the truck with no weight penalty, which is capacity a skip bin was never going to give you anyway.

  Skip bin Our per-load price
Bin hire, ~9m³ $400+GST —
Loading labour $150–200+GST Included
Total, one load ≈ $600+GST $285+GST

Same pile gone. Roughly half the cost.

A skip bin plus the hours it takes your crew to load it comes to around $600+GST for a typical 9m³ load. Our per-load price is $285+GST, labour included — for the same timber, and without the bricks and concrete blowing out a weight limit you didn’t know you had.